|
|
Differences analysis of soil and water conservation measures between schemes and construction drawing designs of soil and water conservation |
SONG Xiuyu1, WANG Yunzhu2, ZHANG Yu1, LI Jinpeng2, ZHANG Hengshuo2, CHENG Jinhua2, ZHA Tonggang2 |
1. Management Office of Miyun Reservoir in Beijing, 101512, Beijing, China; 2. School of Soil and Water Conservation, Beijing Forestry University, 100083, Beijing, China |
|
|
Abstract [Background] Comparing the differences between soil and water conservation schemes (SWCS) and construction drawing designs (CDD) may effectively master the implementation and effects of soil and water conservation measures, and hence providing technical support for the sustainable development of soil and water conservation for production and construction project.[Methods] Differences of 4 rainwater utilization measures (rainwater pipeline, permeable pavement, low elevation greenbelt, and rainwater harvesting pool) and 4 vegetation measures (arbor, shrubs, herb and grass-embedded bricks) of 50 typical projects in Beijing between SWCS and CDD were compared, and situations of compliance with standard for 3 indexes of the forest coverage, rainwater utilization rate and rate of hardened ground were analyzed.[Results] 1) There were widespread differences in soil and water conservation measures between SWCS and CDD. There were markedly differences in one or more water conservation measures for 90% of the 50 analyzed projects, and the number of projects with obvious differences in rainwater utilization measures was lower than that of vegetation measures. 2) Except the rainwater harvesting pool, there were obvious differences in the other three rainwater utilization measures. Except the socking bricks, the other three vegetation measures showed obvious differences, with the largest reduction rate of trees was 84.3% and the largest increase rate of shrubs was 103.2%. 3) Soil and water loss indicators reached the standard well, with rainwater utilization rate, forest coverage, and control rate of hardening ground were 90%, 84% and 100% respectively.[Conclusions] Therefore, the main reason of the differences between SWCS and CDD was that the following design was complied with the scheme of protecting indexes of soil and water losses, but ignoring the specific layout system of soil and water conservation systems. The process management should be strengthened in the coming projects of production and construction projects.
|
Received: 09 December 2019
|
|
|
|
|
[1] |
牛崇桓, 程复. 关于生产建设项目水土流失防治标准体系的探讨[J].中国水土保持,2018(5):9. NIU Chongheng, CHENG Fu. Discussion on standard system on soil and water loss control of the production and construction projects[J]. Soil and Water Conservation in China, 2018(5):9.
|
[2] |
赵永军, 袁普金, 刘宪春. 关于水土保持方案审批正负面清单的有关思考[J].中国水土保持科学, 2019, 17(1):131. ZHAO Yongjun, YUAN Pujin, LIU Xianchun. Considerations on the positive and negative list in the administrative examination and approval of soil and water conservation scheme[J]. Science of Soil and Water Conservation, 2019, 17(1):131.
|
[3] |
赵永军. 生产建设项目水土流失防治综述[J]. 中国水土保持, 2007(4):47. ZHAO Yongjun. Summary on soil and water loss prevent and control ofthe production and construction projects[J]. Soil and Water Conservation in China, 2007(4):47.
|
[4] |
张军政,杨军严, 董牧. 当前生产建设项目水土保持工作存在的问题及对策[J].中国水土保持,2020(12):22. ZHANG Junzheng, YANG Junyan, DONG Mu. Problems and countermeasures of the soil and water conservation work in currentproduction and construction projects[J]. Soil and Water Conservation in China,2020(12):22.
|
[5] |
蔡陇海. 水土保持方案落实阶段若干问题的探讨[J]. 中国水土保持科学, 2014,12(1):102. CAI Longhai.Discussion on the implementation and inspection of soil and water conservation program[J]. Science of Soil and Water Conservation, 2014,12(1):102.
|
[6] |
姜德文. 水土保持方案的编审重点及对工程建设的约束作用[J]. 中国水土保持, 2017(1):19. JIANG Dewen. Editing and investigation emphasis of soil and water conservation scheme and its restraint functions to the engineering construction[J]. Soil and Water Conservation in China, 2017(1):19.
|
[7] |
姜德文. 新时代水土流失治理目标及评价标准[J]. 中国水土保持科学, 2020,18(2):140. JIANG Dewen. Objectives and evaluating indicators of soil erosion control in the new era[J]. Science of Soil and Water Conservation, 2020,18(2):140.
|
[8] |
吴平. 水土保持方案应尽早纳入主体工程设计——结合工程实例解读新的方案审查要点[J]. 中国水土保持, 2015(8):21. WU Ping. The soil and water conservation scheme should be incorporated into the main engineering design as early as possible:Interpreting the key points of reviewing the soil and water conservation scheme[J]. Soil and Water Conservation in China, 2015, (8):21.
|
[9] |
刘娜, 杨丛, 王建. 北京市大兴区雨水利用实施情况分析[J]. 北京水务, 2018(1):41. LIU Na, YANG Cong, WANG Jian. Analyzing the implementation of rainwater utilization in Daxing district, Beijing[J]. Beijing Water, 2018(1):41.
|
[10] |
夏玉慧, 王江, 辛静. 开发建设项目水土保持设施验收技术评估工作面临的问题及其对策[J]. 水土保持通报, 2015,35(3):149. XIA Yuhui, WANG Jiang, XIN Jing. Problems and countermeasures of soil and water conservation facilities technical evaluation of development and construction projects[J]. Bulletin of Soil and Water Conservation, 2015,35(3):149.
|
[11] |
贺晓庆, 祁兴会,陈振, 等. 北京市建设项目水影响评价审查实施效果后评价研究——以房屋建设类项目为例[J]. 北京水务, 2018(6):28. HE Xiaoqing, QI Xinghui, CHEN Zhen, et al. Post evaluation of implementation effects on water impact assessment of construction projects in Beijing:Case study on housing construction projects[J]. 2018(6):28.
|
[12] |
姜德文. 新国标实施后水土保持方案重要内容探讨[J]. 中国水土保持, 2019(9):1. JIANG Dewen. Discussion on the important items of soil and water scheme after the implementation of the new national standard[J].Soil and Water Conservation in China, 2019(9):1.
|
[13] |
毕华兴, 侯贵荣, 袁普金, 等. 含城市代征用地的生产建设项目林草覆盖率计算及验收达标判别——以北京市为例[J]. 中国水土保持科学,2021,19(2):80. BI Huaxing, HOU Guirong, YUAN Pujin, et al.Forest and grass coverage calculation and acceptance criteria for production and construction projects involving urban representing requisitioned land:Taking Beijing as an example[J]. Science of Soil and Water Conservation, 2021,19(2):80.
|
|
|
|