Abstract:[Background] The Yangtze River Basin shelterbelt system construction project is the first national key ecological treatment project in China. In order to improve the deteriorating ecological environment of the Yangtze River Basin, China has put forward the overall goal of building shelter forests in the Yangtze River Basin. It is planned to use 30-40 years to plant trees in the Yangtze River Basin, increase the area of forests, improve the situation of soil erosion, and ensure social and economic development.[Methods]Through the implementation of the Yangtze River Basin shelterbelt system construction project, we will continue to push forward the watershed ecological management work.[Results] Promoting ecological management in the Yangtze River Basin with the model of ecological engineering has achieved remarkable results, and has achieved obvious ecological, economic and social benefits.[Conclusions] Through reviewing the 30-year history of the construction of the protective forest system project in the Yangtze River Basin, this paper clarifies the development context of the Yangtze River Basin engineering control in China, summarizes the technical system and comprehensive control model of soil and water loss by biological measures such as afforestation, and extends the successful experience and typical achievements to other areas. We are looking forward to the future development trend of the Yangtze River Basin shelter forest construction in China.
覃庆锋1, 陈晨2, 曾宪芷1, 贺佳飞1. 长江流域防护林体系工程建设30年回顾与展望[J]. 中国水土保持科学, 2018, 16(5): 145-152.
QIN Qingfeng, CHEN Chen, ZENG Xianzhi, HE Jiafei. Review and prospect of protection forest system construction in the Yangtze River Basin in the past 30 years. SSWC, 2018, 16(5): 145-152.
张志达.全国十大林业生态建设工程[M].北京:中国林业出版社,1997:12. ZHANG Zhida. The ten largest forestry ecological construction projects in China[M]. Beijing:China Forestry Publishing House, 1997:12.
[2]
国家林业局.长江中上游防护林体系建设一期工程总体规划(1989-2000年)[Z]. State Forestry Administration. General Planning for the First Phase Project of Protective Forest System Construction in the Middle and Upper Reaches of the Yangtze River (1989-2000)[Z].
[3]
国家林业局.长江流域防护林体系建设二期工程规划(2001-2010年)[Z]. State Forestry Administration.Planning for the two phase of protection forest system construction in the Yangtze River Basin (2001-2010)[Z].
[4]
国家林业局.长江流域防护林体系建设三期工程规划(2011-2020年)[EB/OL].http://www.forestry.gov.cn/portal/main/s/72/content-594998.html State Forestry Administration.Planning for the Third Phase Project of Protective Forest System Construction in the Yangtze River Basin (2011-2020)[EB/OL]. http://www.forestry.gov.cn/portal/main/s/72/content-594998.html
[5]
国家林业局.林业发展"十二五"规划[EB/OL].(2011-08-30)[2017-08-25].http://www.forestry.gov.cn/main/4818/content-797384.html State Forestry Administration.Twelfth Five-Year Plan for Forestry Development[EB/OL].(2011-08-30)[2017-08-25]. http://www.forestry.gov.cn/main/4818/content-797384.html
[6]
国家发展改革委国家林业局.关于下达重点防护林工程2011年中央预算内投资计划的通知[Z]. State Forestry Bureau of the State Development and Reform Commission. Notice on the Central Budget Investment Plan for the Key Shelterbelt Projects in 2011[Z].
[7]
国家发展改革委国家林业局.关于下达重点防护林工程2012年中央预算内投资计划的通知[Z]. State Forestry Bureau of the State Development and Reform Commission. Notice on the Issue of the Central Budget Investment Plan for Key Shelterbelt Projects in 2012[Z].
[8]
国家发展改革委国家林业局.关于下达重点防护林工程2013年中央预算内投资计划的通知[Z]. State Forestry Bureau of the State Development and Reform Commission. Notice on the Central Budget Investment Plan for the Key Shelterbelt Projects in 2013[Z].
[9]
国家发展改革委国家林业局.关于下达重点防护林工程2014年中央预算内投资计划的通知[Z]. State Forestry Bureau of the State Development and Reform Commission. Notice on the Issue of Investment Plan in the Central Budget of the Key Shelterbelt Projects in 2014[Z].
[10]
国家发展改革委国家林业局.关于下达重点防护林工程2015年中央预算内投资计划的通知[Z]. State Forestry Bureau of the State Development and Reform Commission. Notice on the Central Budget Investment Plan for Key Shelterbelt Projects in 2015[Z].
[11]
国家发展改革委国家林业局.关于下达重点防护林工程2016年中央预算内投资计划的通知[Z]. State Forestry Bureau of the State Development and Reform Commission. Notice on the Central Budget Investment Plan for the Key Shelterbelt Projects in 2016[Z].
[12]
国家发展改革委国家林业局.关于下达重点防护林工程2017年中央预算内投资计划的通知[Z]. State Forestry Bureau of the State Development and Reform Commission. Notice on the Central Budget Investment Plan for the Key Shelterbelt Projects in 2017[Z].
[13]
国家发展改革委国家林业局.关于下达重点防护林工程2018年中央预算内投资计划的通知[Z]. State Forestry Bureau of the State Development and Reform Commission. Notice of the Central Budget of the Key Shelterbelt Projects for 2018[Z].
[14]
国家林业局.长江、珠江流域防护林体系工程建设技术规程(LY-T 1760-2008)[S]. State Forestry Administration.Technical Regulations for the Construction of Shelterbelt Systems in the Yangtze and Pearl River Valleys (LY-T 1760-2008)[S].
[15]
唐德瑞,赵秉伦.陕西省长江流域防护林体系营建技术[J].陕西林业科技,1994(3):24. TANG Derui, ZHAO Binglun. Shaanxi province Yangtze River basin shelterbelt system construction technology[J].Shaanxi Forestry Science and Technology, 1994(3):24.
[16]
曹小飞.贵州省长江流域防护林体系建设分区及治理对策[J].安徽农业科学,2013,41(15):6760. CAO Xiaofei. Regionalization of shelter forest system construction and Countermeasures in the Yangtze River valley of Guizhou Province[J].Anhui Agricultural Science, 2013, 41(15):6760.
[17]
陶忠芳,席庆,万玉衡.安徽省长江流域防护林三期体系构建[J].安徽农业科学,2015(25):145. TAO Zhongfang, XI Qing, WAN Yuheng.Construction of the three-stage shelter forest system in the Yangtze River valley of Anhui Province[J].Anhui Agricultural Science, 2015(25):145.
[18]
薛家翠,曾祥福,黎曙光,等.三峡库区长江防护林模式的研究[J].水土保持研究,2006,13(6):37. XUE Jiacui, ZENG Xiangfu, LI Shuguang, et al. Study on the Yangtze River shelterbelt model in the three gorges reservoir area[J]. Study on Soil and Water Conservation, 2006, 13(6):37.
[19]
孙茂者,程爱林,张黎琳,等.长江流域防护林体系建设成效评价——以浙江省为例[J].浙江林业科技,2012,32(1):74. SUN Maozhe, CHENG Ailin, ZHANG Lilin, et al. Evaluation of the effectiveness of shelter forest system construction in the Yangtze River valley:A case study of Zhejiang Province[J].Zhejiang Forestry Science and Technology, 2012, 32(1):74.
[20]
魏志群,刘先祥,罗会礼,等.长江防护林体系营建技术研究[J].人民长江,1990(2):13. WEI Zhiqun, LIU Xianxiang, LUO Huili, et al. Study on the construction technology of the Yangtze River shelterbelt system[J].People's Yangtze River, 1990(2):13.
[21]
程伟,丁相雷.淄川区长江防护林建设现状及对策建议[J].防护林科技,2014(5):51. CHENG Wei, DING Xianglei. Present situation and countermeasures of protection forest construction in Zichuan area of the Yangtze River[J]. Protection Forest Science and Technology, 2014(5):51.
[22]
邓中美,汪元明.三峡库区长江防护林技术研究与应用[J].防护林科技,2007(3):59. DENG Zhongmei, WANG Yuanming. Research and application of Yangtze River shelterbelt technology in Three Gorges Reservoir area[J].Protection Forest Science and Technology, 2007(3):59.
[23]
董德友.安徽省长江防护林建设与管理[J].江淮水利科技,2007(4):20. DONG Deyou.Construction and management of the Yangtze River Shelter Forest in Anhui province[J].Jianghuai Water Conservancy Technology, 2007(4):20.
[24]
晏健钧,晏艺翡.陕西省长江流域防护林体系建设成效及存在问题和对策[J].陕西林业科技,2013(6):48. YAN Jianjun, YAN Yiyi.The effects, problems and countermeasures of shelter forest system construction in the Yangtze River valley of Shaanxi province[J].Shaanxi Forestry Science and Technology, 2013(6):48.
[25]
陈再福.云南省长江防护林工程管理方法的利弊分析[J].云南林业科技,2002(2):70. CHEN Zaifu.Advantages and disadvantages of the Yangtze River shelterbelt project management methods in Yunnan province[J].Yunnan Forestry Science and Technology, 2002(2):70.
[26]
陈晓萍,何友军,陈志阳,等.湖南省长江防护林体系建设的现状与构想[J].湖南农业大学学报(社会科学版),2001(3):73. CHEN Xiaoping, HE Youjun, CHEN Zhiyang, et al. Present situation and conception of the construction of the Yangtze River shelterbelt system in Hunan province[J]. Journal of Hunan Agricultural University (Social Science Edition), 2001(3):73.
[27]
薛家翠,曾祥福,黎曙光,等.三峡库区长江防护林模式的研究[J].水土保持研究,2006,13(6):37. XUE Jiacui, ZENG Xiangfu, LI Shuguang, et al. Study on the Yangtze River shelterbelt model in the Three Gorges Reservoir area[J]. Research of Soil and Water Conservation, 2006, 6(13):37.
[28]
陈晓萍,何友军,陈志阳,等.湖南省境内长江中上游防护林体系建设第一期工程的进展[J].湖南环境生物职业技术学院学报,2001(2):11. CHEN Xiaoping, HE Youjun, CHEN Zhiyang, et al. Progress of the first phase project of protective forest system construction in the middle and upper reaches of the Yangtze River in Hunan province[J].Journal of Hunan Environmental Biology Vocational and Technical College, 2001(2):11.
[29]
陈春生.长江防护林建设有关问题的探讨:宜昌地域长防林建设现状之管见[J].中南林业调查规划,1991(1):15. CHEN Chunsheng. Discussion on the construction of Yangtze River Shelter Forest:A humble opinion on the present situation of the construction of long distance forest in Yichang area[J].Central South Forest Inventory and Planning, 1991(1):15.
[30]
成子纯.长江防护林体系持续经营的战略思考[J].中南林学院学报,1996(3):76. CHENG Zichun. Strategic thinking on sustainable management of Yangtze River shelterbelt system[J].Journal of Central South Forestry College, 1996(3):76.
[31]
佗奇.礼县长江流域防护林体系工程建设成效及可持续发展的分析[J].甘肃科技,2014,30(16):142. TUO Qi. Analysis of the effects of shelterbelt construction in Lixian county in Yangtze River Basin and sustainable development[J]. Gansu Science and Technology, 2014,30(16):142.
[32]
孙茂者,麻锡亮,李佐晖,等.浙江省长江防护林三期体系构建[J].华东森林经理,2012,26(3):32. SUN Maozhi, MA Xiliang, LI Zuohui, et al. Construction of the third phase system of Yangtze River shelterbelt in Zhejiang province[J].East China Forest Manager, 2012, 26(3):32.
[33]
袁世超.贵池市生态经济型长江防护林体系建设研究[J].池州师专学报,2000(3):32. YUAN Shichao. Study on the construction of eco-economic Yangtze River shelterbelt system in Guichi city[J].Journal of Chizhou Teachers College, 2000(3):32.
[34]
肖彬.湖南长江防护林工程建设技术实践与问题探讨[J].湖南林业科技,1994(4):27. XIAO Bin. Discussion on the technical practice and problems of the construction of the Yangtze River shelterbelt project in Hunan[J].Hunan Forestry Science and Technology, 1994(4):27.
[35]
衷玉红,詹春森,张扬纯.鄱阳湖防护林体系工程建设可持续发展对策研究[J].江西林业科技,2014,42(2):30. ZHONG Yuhong, ZHAN Chunsen, ZHANG Yangchun. Study on sustainable development strategy of Poyang lake shelterbelt system project[J].Jiangxi Forestry Science and Technology, 2014, 42(2):30.
[36]
代玉波.四川长江防护林体系建设发展战略初探[J].四川林业科技,2011,32(2):70. DAI Yubo. Preliminary study on the development strategy of the Yangtze River shelterbelt system in Sichuan[J].Sichuan Forestry Science and Technology, 2011,32(2),:70.
[37]
朱丽,秦富仓,姚云峰,等.华北土石山区流域防护林空间配置模式[J].江苏农业科学,2012,40(1):337. ZHU Li, QIN Fucang, YAO Yunfeng, et al. Spatial allocation model of shelterbelts in the earth-rock mountainous area of North China[J]. Jiangsu Agricultural Science, 2012, 40(1):337.