Abstract:[Background] In order to do well the reformation of the administrative examination and approval items, the Ministry of Water Resources will explore and formulate list of positive and negative sides for the approval of soil and water conservation scheme.[Methods] In this paper, the practical work of several kinds of positive and negative lists,such as Industry access, project access, access to government and administrative approval are summarized and analyzed. Also, some related research about soil and water conservation are consulted. On this basis, the basic principles and general ideas of the positive and negative list for the approval of soil and water conservation scheme are put forward.[Results] The main contents of positive and negative list from the basic case of the project, the project site, construction scheme, construction organization and scheduling, waste disposal, earthwork, debit the scope of responsibility, control objectives, control measures of soil and water conservation, the construction organization and scheduling of the soil and water conservation measures, monitoring, investment etc., are discussed. The positive list includes 13 items, such as:1) The scheme is reported before construction. 2) Site selection does not involve restricted areas. 3) The project construction plan describes clearly. 4) Main earth and stone square engineering construction technology is clear. 5) The responsibility boundary for soil erosion control is clear. 6) The standard grade and index value of soil erosion control are clear. 7) The location of abandoned soil(slag) field is clear and meets for compliance of site selection. 8) The system of measures for water and soil conservation in sub-districts is complete and the design standards are clear. 9) Topsoil protection measures are clear. 10) The task, content and reporting system for soil and water conservation monitoring and supervision are clear. 11) the compensation for soil and water conservation is clear. The negative list includes 11 items, the scheme will be refused if any item can not be satisfied. Among the items, several questions should be taken more attention, such as, if the project has been constructed or finished without government's approval, persons or the organizations should be punished. The scheme can not be admitted if the construction progress did not implement the "Three simul taneity" system and did not satisfy the principle of first stopping and then abandoning.[Conclusions] It is a powerful action that the positive and negative list of approval of soil and water conservation scheme are carried out. This will reduce the discretionary power of the executive branch, and support the public's right to know. In general, the soil and water conservation scheme that is meet the requirements of the positive list, the administrative examination and approval procedures will be simplified or accelerated. If the scheme that is meet the requirements of the negative list, it will be refused.
赵永军, 袁普金, 刘宪春. 关于水土保持方案审批正负面清单的有关思考[J]. 中国水土保持科学, 2019, 17(1): 131-136.
ZHAO Yongjun, YUAN Pujin, LIU Xianchun. Considerations on the positive and negative list in the administrative examination and approval of soil and water conservation scheme. SSWC, 2019, 17(1): 131-136.
刘绮慧,宾建成,陶小龙.上海自贸区负面清单管理的现状与完善[J]. 中国市场,2017(11):265. LIU Qihui,BIN Jiancheng,TAO Xiaolong. Current situation and perfection of negative list Management in Shanghai Free Trade area[J]. Chinese Market, 2017(11):265.
[2]
肖金成,刘通. 把牢生态环境保护的第一道关口:《重点生态功能区产业准入负面清单编制实施办法》解读[J]. 环境保护,2017,45(4):10. XIAO Jincheng, LIU Tong.The innovation of making the negative list of the industry entrance of the national key ecological function zones[J]. Environmental Protection, 2017,45(4):10.
[3]
姜德文,郭索彦,赵永军,等. 生产建设项目水土保持准入条件通用条款[J]. 中国水土保持科学,2010,8(3):43. JIANG Dewen,GUO Suoyan, ZHAO Yongjun, et al. Universal items on of permitted requirements of soil and water conservation for production and construction projects[J]. Science of Soil and Water Conservation, 2010,8(3):43.
[4]
赵永军,党维勤,陈吉虎,等. 水泥工业项目水土保持准入条件[J]. 中国水土保持科学,2010,8(3):104. ZHAO Yongjun,DANG Weiqin,CHEN Jihu,et al. Permitted requirements of soil and water conservation for cement industry projects[J]. Science of Soil and Water Conservation,2010,8(3):104.