���¿��ټ��� �߼�����
   ��ҳ  �ڿ�����  ��ί��  Ͷ��ָ��  �ڿ�����  ��������  �� �� ��  ��ϵ����
�й�ˮ�����ֿ�ѧ 2010, Vol. 8 Issue (3) :104-107    DOI:
���� ����Ŀ¼ | ����Ŀ¼ | ������� | �߼����� << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
ˮ�๤ҵ��Ŀˮ������׼������
*
Permitted requirements of soil and water conservation for cement industry projects

ժҪ
�����
�������
Download: PDF(196KB)   HTML 1KB   Export: BibTeX or EndNote (RIS)      Supporting Info
���µ��� null
ժҪ ͨ����ˮ�๤�̵����͡���ɡ�ռ���Լ�ʩ�����������ա���ʯ�����������ķ���,�ܽ��ˮ�๤���ڽ��������������е�ˮ����ʧ�ص�,ˮ�๤���ڽ����ڼ��ˮ����ʧ�ص������dz���,������������������ʯ��ʯ�������,������ˮ����������������������ķ۳���ˮ�๤�̳���Ӧ��ѭ"����������Ŀˮ������׼������ͨ������"�е�������,�����漰ˮ���ҵ�ķ��ɡ����桢�淶�����ߡ���׼����չ��Ҫ����ҵ��չ�滮,�����ˮ�๤����Ŀ�ķ���������ͻ�����13��ˮ������׼������������ˮ�������¹�����йط���Ĺ涨,��ϵ��Ͱ�������,���������������Ƶ�5��׼�����������޸�ˮ�����ַ�����4��׼��������
Service
�ѱ����Ƽ�������
�����ҵ����
�������ù�����
Email Alert
RSS
�����������
������
����
�¼���
���
�ؼ����� ˮ�๤ҵ   ˮ������   ׼������   ��ҵ��Ŀ   ˮ�����ַ���     
Abstract�� Based on the analysis of types,components,land occupation,production technology,earthwork and waste involved in cement inductry projects,the characteristics of soil erosion and water loss during the construction and manufacturing procedure of cement works are shown.Soil erosion and water loss mainly occur during the construction of cement works while during production,it is mainly the exploitation of lime and clay and the dust released in the factory.According to the "universal items of the permitted requirements of soil and water conservation for construction and production projects" in reference to the related laws,rules,regulations,policies,codes,development guidelines and industry development program in cement industry,13 items of permitted requirements of soil and water conservation are put forward in this research for rejection,restricted approval and delayed approval of cement industry projects.On the basis of related laws and regulations and the new national code for soil and water conservation and in light of analysis of typical cases,5 items of permitted requirements are put forward in this research that required the revision of the main-building design,and 4 items that required the revision of the soil and water conservation plan.
Keywords�� cement industry   soil and water conservation   permitted requirement   industry project   soil and water conservation plan     
Fund:

���Ҳ�������ˮ����2008ר��“����������Ŀˮ������׼�������о�”(1260816153)

���ñ���:   
������, ��ά��, �¼���, ���.ˮ�๤ҵ��Ŀˮ������׼������[J]  �й�ˮ�����ֿ�ѧ, 2010,V8(3): 104-107
DIAO Yong-Jun, DANG Wei-Qi, CHEN Ji-Hu, XU Cheng.Permitted requirements of soil and water conservation for cement industry projects[J]  , 2010,V8(3): 104-107
���ӱ���:  
http://www.sswcc.org//CN/     ��     http://www.sswcc.org//CN/Y2010/V8/I3/104
Copyright 2010 by �й�ˮ�����ֿ�ѧ