1.Inner Mongolia Hydraulic Research Institute,010020,Huhhot;2.Monitoring Center of Soil and Water Conservation,MWR,100055,Beijing;3.Hydraulic Institute of YRCC,MWR,450003,Zhengzhou: China
Abstract:Based on investigation and research on coal mine project composition,occupation of land,its construction and production technology in connection with water and soil losses,allocation and transportation of waste,the characteristics of water and soil losses during the project construction and production,and the measures for water and soil losses,in light of the related laws,rules,industry policies,sector planning and technical norms,this research has put forward 10 basic items for permitted requirements,9 items for estricted approval,8 items for delayed approval with regard to soil and water conservation for coal mine.This research has also raised 34 permitted requirements items of soil and water conservation for soil and water conservation program of projects in different soil and water losses zones,15 items that require the revision of designing and 2 items that require revision and improvement of soil and water conservation program.Besides,13 items with regard to the priority and delayed approval of soil and water conservation program have also been raised in this research.