1.Guangxi Electric Industry Investigation Design and Research Institute,530023,Nanning;2.China Power Engineering Consulting Corporation Central and Southern Electric Power Design,430071,Wuhan;3.Monitoring Center of Soil and Water Conservation,MWR,100055,Beijing: China
Abstract:Based on the analysis of types,components,land occupation,production technology,earthwork and waste involved in power projects,the characteristics of soil erosion and water loss during the construction is shown.Considering the development planning,national policies and industrial distribution related to power industry,a total of 50 permitted requirements of soil and water conservation for power projects including restricting and delaying are put forward.According to the technical specifications and the provisions of the new national standard of soil and water conservation,11 items of permitted requirements of soil and water conservation for main-building design revision and 7 items of permitted requirements of soil and water conservation for soil and water conservation plan revision are put forward.
郭明凡1;裴华2;徐成3;侯杰萍1;袁永慧1;杨以翠1;曹云1;温存1;常志勇1;孙坤君1;张扬1. 电力工程水土保持准入条件[J]. 中国水土保持科学, 2010, 8(3): 67-73.
GUO Meng-Fan-;Fei-Hua-;Xu-Cheng-;Hou-Jie-Ping-;Yuan-Yong-Hui-;Yang-Si-Cui-;Cao-Yun-;Wen-Cun-;Chang-Zhi-Yong-;Sun-Kun-Jun-;Zhang-Yang. Permitted requirements of soil and water conservation for power projects. SSWCC, 2010, 8(3): 67-73.