|
|
Construction technique of flow collecting plot with MBER soil stabilizer |
Fan Henghui 1,2,3, Gao Jian'en 1,2,3, Wu Pute 1,2,3, Sun Shengli4 |
1.Research Centre of Soil and Water Conservation & Eco-environment, Chinese Academy of Sciences, Ministry of Education; 2.National Engineering and
Technology Research Centre for Water Saving Irrigation at Yangling; 3.College of Water Conservancy and Architectural Engineering , Northwest Sci-Tech University of Agriculture and Forestry: 712100, Yangling, Shaanxi; 4.Haiwei Factory of building material, 452100, Gongyi, Henan: China |
|
|
Abstract Flow collecting plot is an important component of collecting rainwater for irrigation. The ordinary impermeable materials of artificial catchments area include concrete,polyethylene film and asphalted fiberglass oil sheeting, which have high flow collecting efficiency but have some weaknesses of high cost or poor durability. The soil stabilizer applying to the flow collecting plot in water harvesting system can solve effectively the above-mentioned problems, so it is paid attention to increasingly. Based on introduction of the composition and the solidifying mechanism of the MBER soil stabilizer, the requirements of the raw material and the design of the proportion and structure, construction technique and advances are focused on that the equality, water contents and the construction time of mixture are key points of dry mixture construction technique. Finally it is suggested that plastic mixture construction technique should be enhanced.
|
Received: 04 October 2004
|
|
|
|
|
|
|