Response of anthropogenic soil and water loss risk and classified supervision for production and construction projects: Take Wuhan city as an example |
CHENG Dongbing1, MA Meijing2, HUA Zhongguang3, ZHANG Jingxin4, SUN Baoyang1 |
1. Changjiang River Scientific Research Institute, 430010, Wuhan, China; 2. Wuhan Institute of Water Sciences, 430014, Wuhan, China; 3. Wuhan Water Supplies Bureau, 430014, Wuhan, China; 4. College of Civil Engineering and Architecture, China Three Gorges University, 443002, Yichang, Hubei, China |
|
|
Abstract [Background] In the coming period, the intensity of development and construction in China will remain at a high level, and there is a long way to go to prevent and control anthropogenic soil and water loss. In order to achieve the classification and differential control of anthropogenic soil and water loss, it is urgent to carry out research on the risk assessment and classification supervision of anthropogenic soil and water loss in production and construction projects. [Methods] On the basis of defining the risk of anthropogenic soil and water loss, based on previous research results, combined with practical experience, and combining qualitative and quantitative methods, this paper put forward the risk assessment method of anthropogenic soil and water loss for production and construction projects. The risk level were determined by combing the potential risk assessment of soil & water loss and evaluation of soil & water conservation during construction. The completed projects mainly determined the risk level based on the evaluation of soil and water conservation. Taking Wuhan as an example, the method was used to assess the risk of 117 production and construction projects at the city level. [Results] The production and construction projects in Wuhan were mainly risk-free, accounting for 66.7% of the total number of projects. The second was low-risk level, accounting for 25.6% of the total number of projects. The medium-, high- and very high-risk levels accounted for only 2.6%, 1.7% and 3.4% of the total number of projects, respectively. Among them, the high-risk level and extremely high-risk level projects were mainly due to the failure to carry out soil and water conservation monitoring in time while the project started, and the lack of implementation of soil and water loss prevention measures has issued rectification documents. On this basis, in accordance with the overall requirements of "No risk do not disturb, low risk pre-warning, medium-high risk strict monitoring", combined with other needs of project management, the specific suggestions for the differential classified supervision of the production and construction projects in Wuhan were put forward. [Conclusions] Through the analysis of typical cases, the evaluation results are consistent with the actual situation, which proves that the risk assessment method of anthropogenic soil and water loss for production and construction projects proposed in this paper is scientific and feasible, and it is of great significance in supporting the classified supervision of production and construction projects. In the actual formulation of the regulatory program, the assessment of risk magnitude and level is an important foundation and basis, but it should be considered in conjunction with the relevant regulatory provisions and other needs.
|
Received: 23 October 2023
|
|
|
|
|
[1] |
蒲朝勇. 以体制机制政策创新为抓手推进新阶段水土保持高质量发展的思考[J]. 中国水利, 2023(10):4. PU Chaoyong. Promoting high-quality development for soil and water conservation in the new stage through system, mechanism and policy innovation[J]. China Water Resources, 2023(10):4.
|
[2] |
中华人民共和国水利部. 2021年中国水土保持公报[EB/OL]. (2022-07-13) [2023-10-23]. http://www.mwr.gov.cn/sj/tjgb/zgstbcgb/202207/t20220713_1585301.html. The Ministry of Water Resources of P. R. China. The communique of soil and water conservation in 2021[EB/OL]. (2022-07-13) [2023-10-23]. http://www.mwr.gov.cn/sj/tjgb/zgstbcgb/202207/t20220713_1585301.html.
|
[3] |
中共中央办公厅国务院办公厅印发《关于加强新时代水土保持工作的意见》 [EB/OL]. (2023-01-03) [2024-02-27]. https://www.gov.cn/gongbao/content/2023/content_5738894.htm. General Office of CPC Central Committee and the General Office of the State Council issued "Views on strengthening soil and water conservation work in the New Era" [EB/OL]. (2023-01-03) [2024-02-27]. https://www.gov.cn/gongbao/content/2023/content_5738894.htm.
|
[4] |
中华人民共和国水利部. 关于进一步深化"放管服"改革全面加强水土保持监管的意见[EB/OL]. (2019-05-31)[2023-10-23]. https://www.gov.cn/gongbao/content/2019/content_5437147.htm. Ministry of Water Resources of the People's Republic of China. Opinions on further deepening the reform of "Putting in Place and Serving" and comprehensively strengthening the supervision of soil and water conservation[EB/OL]. (2019-05-31)[2023-10-23].https://www.gov.cn/gongbao/content/2019/content_5437147.htm.
|
[5] |
中华人民共和国水利部办公厅. 关于印发生产建设项目水土保持监督管理办法的通知[EB/OL]. (2019-07-30)[2023-10-23]. https://www.gov.cn/zhengce/2023-01/17/content_5740453.htm. General Office of the Ministry of Water Resources of the People's Republic of China. Notice on the issuance of supervision and management measures for water and soil conservation in production and construction projects[EB/OL]. (2019-07-30)[2023-10-23].https://www.gov.cn/zhengce/2023-01/17/content_5740453.htm.
|
[6] |
中华人民共和国水利部办公厅. 关于实施生产建设项目水土保持信用监管"两单"制度的通知[EB/OL]. (2020-07-27)[2023-10-23]. http://www.mwr.gov.cn/zwgk/gknr/202008/t20200805_1441267.html. General Office of the Ministry of Water Resources of the People's Republic of China. Notice on the implementation of the "Two-Sheet" system for credit supervision of soil and water conservation in production and construction projects[EB/OL]. (2020-07-27)[2023-10-23]. http://www.mwr.gov.cn/zwgk/gknr/202008/t20200805_1441267.html.
|
[7] |
中华人民共和国水利部办公厅. 关于进一步加强生产建设项目水土保持监测工作的通知[EB/OL]. (2020-07-28)[2023-10-23]. http://www.mwr.gov.cn/zwgk/gknr/202008/t20200805_1441271.html. General Office of the Ministry of Water Resources of the People's Republic of China. Notice on further strengthening the monitoring of soil and water conservation in production and construction projects [EB/OL]. (2020-07-28)[2023-10-23]. http://www.mwr.gov.cn/zwgk/gknr/202008/t20200805_1441271.html.
|
[8] |
中华人民共和国水利部办公厅. 《水土保持"十四五"实施方案》[EB/OL]. (2021-12-30)[2023-10-23]. http://www.mwr.gov.cn/zw/tzgg/tzgs/202201/t20220105_1558115.html. General Office of the Ministry of Water Resources of the People's Republic of China. Implementation plan for the 14th five-year plan for soil and water conservation [EB/OL]. (2021-12-30)[2023-10-23]. http://www.mwr.gov.cn/zw/tzgg/tzgs/202201/t20220105_1558115.html.
|
[9] |
程冬兵, 张平仓. 试论水土保持风险管理[J]. 中国水利, 2018(10): 48. CHENG Dongbing, ZHANG Pingcang. Discussions on risk management of soil and water conservation[J]. China Water Resources, 2018(10): 48.
|
[10] |
赵凤伟, 高金晖, 高阳, 等. 深圳市生产建设项目水土流失风险等级划分[J]. 中国水土保持, 2022(12):7. ZHAO Fengwei, GAO Jinhui, GAO Yang, et al. Risk classification of soil and water loss of production and construction projects in Shenzhen[J]. Soil and Water Conservation in China, 2022(12):7.
|
[11] |
《生产建设项目水土保持分类管理名录研究》课题组. 生产建设项目水土保持分类管理研究[M]. 北京: 中国水利水电出版社, 2016:34. "Study on the list of classified management of soil and water conservation for production and construction projects" subject group. Study on the list of classified management of soil and water conservation in production and construction projects[M]. Beijing: China Water Power Press, 2016:34.
|
[12] |
中华人民共和国水利部办公厅. 关于印发生产建设项目水土保持问题分类和责任追究标准的通知[EBOL]. (2020-07-24)[2023-10-23]. http://www.mwr.gov.cn/zwgk/gknr/202008/t20200805_1441268.html. General Office of the Ministry of Water Resources of the People's Republic of China. Circular on the issuance of standards for categorizing and accountability for soil and water conservation problems in production and construction projects [EB/OL]. (2020-07-24)[2023-10-23]. http://www.mwr.gov.cn/zwgk/gknr/202008/t20200805_1441268.html.
|
|
|
|