���¿��ټ��� �߼�����
   ��ҳ  �ڿ�����  ��ί��  Ͷ��ָ��  �ڿ�����  ��������  �� �� ��  ��ϵ����
�й�ˮ�����ֿ�ѧ 2010, Vol. 8 Issue (3) :108-111+116    DOI:
���� ����Ŀ¼ | ����Ŀ¼ | ������� | �߼����� << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
�ܵ�����ˮ������׼������
���,������,������,����,������*
Permitted requirements of soil and water conservation for pipeline-type projects
 LIU  Ai-Zhang, HAN  Feng-Xiang, GAO  Zhao-Liang, WANG  Xiang-Dong, ZHOU  Li-Jun*

ժҪ
�����
�������
Download: PDF(132KB)   HTML 1KB   Export: BibTeX or EndNote (RIS)      Supporting Info
ժҪ ���������ܵ�������·�ϳ�,����Ŷ��ĵ�ò���ͺ��������ͽ϶�,��ɵ�ˮ����ʧ����Σ���IJ����Ժܴ�,���̴���Խ��������·����������Ĵ���Ҳ�϶�,�ײ���ֱ��Ӱ���Σ�����ܵ����̹��ڶ�,�����ص�ռ�ö�Ϊ��ʱռ��,��˽�������ĿӰ��̶�С��Ӱ��ʱ��̡���Ϲܵ���Ŀʩ�����輰ˮ����ʧ���ص�,ͨ�����շ��ɡ����桢��׼���滮���������,����˹ܵ�������Ŀ��ˮ������׼������3��,ˮ�����ַ���׼��Ļ�������49��������������������Ƶ�����8�������޸�����ˮ�����ַ���������3��,�������ˮ�����������������ݻ�������13�����顣
Service
�ѱ����Ƽ�������
�����ҵ����
�������ù�����
Email Alert
RSS
�����������
���
������
������
����
������
�ؼ����� �ܵ�����   ˮ������   ׼������     
Abstract�� Oil and gas transmission pipeline-type projects,due to its length,going through various geomorphic types and landforms and result in different soil erosion and water loss and hazards.They may also go through such sensitive areas as rivers and roads,thus bring direct impacts and hazards.However,pipeline-type projects,with short time limits,generally make temporary use of land and therefore are comparatively less in impact and shorter in time.On the basis of the characteristics of pipeline-type projects construction,in light of such materials as laws,regulations,codes,programs,etc.,3 items of permitted requirements of soil and water conservation,49 items of permitted requirements of soil and water conservation plan,8 items that require the revision of the design of the pipeline-type projects,3 items that require the revision and improvement of soil and water conservation plan,and 13 items for restricted approval and delayed approval for soil and water conservation plan are put forward for pipeline-type projects.
Keywords�� pipeline-type project   soil and water conservation   permitted requirement     
Fund:

���Ҳ�������ˮ����2008ר��“����������Ŀˮ������׼�������о�”(1260816153)

���ñ���:   
�ΰ���, ������, ������, ����, ������.�ܵ�����ˮ������׼������[J]  �й�ˮ�����ֿ�ѧ, 2010,V8(3): 108-111+116
LIU Ai-Zhang, HAN Feng-Xiang, GAO Zhao-Liang, WANG Xiang-Dong, ZHOU Li-Jun.Permitted requirements of soil and water conservation for pipeline-type projects[J]  , 2010,V8(3): 108-111+116
���ӱ���:  
http://www.sswcc.org//CN/     ��     http://www.sswcc.org//CN/Y2010/V8/I3/108
Copyright 2010 by �й�ˮ�����ֿ�ѧ